01
- Occupied operations
- Customers, tenants, staff, deliveries, furniture, equipment, noise, odor, and open hours guide the work plan.
02
- Surface schedule
- Walls, ceilings, doors, trim, masonry, steel, floors, service spaces, and exteriors are listed separately.
03
- Preparation standard
- Damage, grease, dirt, loose coating, repairs, stains, moisture, and test areas are tied to each surface.
04
- Phasing
- Work can be divided by room, floor, tenant, elevation, shutdown, turnover, or agreed operating window.
05
- Daily handoff
- Completed zones, protected zones, access, cleanup, touch-ups, and the next phase can be reviewed each day.
06
- Closeout
- The final review follows the area list, approved colors, finish schedule, corrections, cleanup, and responsible contact.